So after a week of hard slog in the flat, where are we now?
All the radiators are now painted and looking great! Importantly we can actually have them on now and thus not freeze in the colder weather. The two bedrooms are all filled and sanded and just need a bit of painting to be done – amazing that it has taken this long even to get a single room finished! Cupboard shelves have all been sanded and undercoated and top coats have started. The cupboards themselves only need a little more filling and then will be ready for painting. All the doors are now ready for painting.
What’s left? Well, sadly, lots…
- in toilet – underfloor heating, boxing in, tiling, paint ceiling, fit mirrored cupboard, hooks
- in hall – filling great big holes still left in walls / ceiling / floor. Paint walls / ceiling, lay flooring, skirting, new door architraves throughout
- bathroom – paint ceiling, clean tiles, grout them, fit new side bath panel out of the right wood and tile it, fit mirrored cupboard, hooks
- kitchen – boxing in pipes, re-levelling floor after idiot builders walked on it whilst wet (nice bootprints), finishing electrics, last row of tiling, grout all tiles, fit doors and lay rubber floor
- lounge – paint ceiling, lay flooring, skirting, fill and paint boxing in and window sills.
So lots and lots to do, by the end of next week – eeps! We have a proper builder from Wednesday though, so hopefully it should be done in time. But we still need help from people if they have any spare time… (its a bit like a telethon, I know)
3 Comments »
RSS feed for comments on this post. Add Comment Feed to Bloglines. TrackBack URI
Leave a comment
This work is licensed under a
Creative Commons Attribution 2.5 License.
Powered by WordPress with Pool theme design by Borja Fernandez, modified by bubb.
Entries and comments feeds.
Valid XHTML and CSS. ^Top^

Hi Bubb, just popped by to say hang on in there, you’ll be there soon and with you and Bea planning it all out, I’m positive the result will be worth it.
Comment by Pete — 13 December 2007 #
Thanks Pete!
We had an electrician come over yesterday to do a full test and annoyingly there is about 2 days work to fix all the stuff that’s not up to standard. That will hold up a lot of the other decorating work because a couple of cables need to be ripped out of a wall and put back with a metal channel to protect them. Arg!
However on the plus side some lovely people have offered us the use of their flat next week and yet another wonderful person has offered us their flat for christmas week. So we won’t have to live on a building site… But really we just want it all done! Grrrr.
Comment by bubb — 14 December 2007 #
The electrician thing is a huge pain, I hope you can get some money back or compensating from the initial builders! The places to stay should hopefully let you keep much closer control on the flat and give you easy access when it does come to decorating etc.
Comment by Pete — 14 December 2007 #